2. The selection, evaluation and classification of inspectors:
The company follows a system to verify the implementation of the services required by qualified inspectors. The company selects inspectors based on their ability to meet the contracting requirements, including Quality Requirements The inspectors are selected, assessed and classified according to procedure (PR-08).

3. Training:
The company is keen to raise the technical and scientific efficiency of all employees at all levels to ensure the implementation of the quality system with the required efficiency and ensure that all work related to the quality of performance The operations are carried out by individuals trained in the performance of these works and to ensure continuous improvement of the level of individuals to achieve the required efficiency to perform their work in a proper manner, at the appropriate times and with competitive performance. • The training needs of the various departments whose business impact on the quality of the operations of the company are identified and reviewed and the actual requirements of the company are determined and according to the training procedure (PR-12).

4. Procurement and supplier evaluation:
The company follows a method of verifying that the items and materials purchased are in conformity with the specified specifications and supply dates, where the company selects its suppliers on the basis of their ability to meet the contracting requirements According to procedure (07PR-).
 
5. Laboratory selection and evaluation:
The company selects and evaluates the laboratories that are cooperating with it in the analysis of samples of materials, goods and goods during inspections inside or outside Libya according to the requirements of Standards and procedures in accordance with Procedure No. (PR-09). The Company has a list of its accredited laboratories and is periodically updated.
 
6. Maintenance and calibration:
The company shall take into consideration the use of any equipment or equipment during the inspections to be for the performance of the work and shall be calibrated and the validity of the calibration certificates shall be verified and followed to the standard All equipment and equipment (office, computer, storage equipment, measuring equipment, etc.) must be maintained periodically.

The equipment containing the programs that contain the latest version of these programs, If an idle device is found, it is distinguished and isolated so that it is not used, and if it is found that one of these devices has been used, it is evaluated (WI-08).

7.Contracting subcontractors:

If subcontractors are required for reasons that may be technical or time-bound, the Al Rayan Inspection and Conformity Company shall verify the capacity of the Contracting Company. With it to carry out the work and inform the customer in accordance with the contract contract sub-No. (11PR-).